Casa Batlló: Introduction
Across Barcelona’s Passeig de Gràcia, the first thing you may notice about Casa Batlló is its roof. Broad glazed tiles overlap like scales, following a ridge that swells and then falls away beside a pale turret. Move your eye down and the façade changes character. Colour breaks into small pieces of glass and larger ceramic discs. The iron balconies project far enough to cast their own shadows, while the stone surrounding the broad first-floor windows narrows and flares like joints. Walk past the house and these elements move against one another. The stone gallery hangs out over the pavement, the ironwork stands in front of the openings, and the colour shimmers on a wall set farther back. [1] [2]
Antoni Gaudí gave the house this frontage between 1904 and 1906 by remodelling an apartment building that already stood on the site. Some of the old walls still carry the upper flats. Downstairs he changed how the building stood up, where the family could receive visitors and how far daylight travelled into the plan. The windows behind the stone gallery show what this meant for the people who lived there. From inside, sections of glass and wood can move out of the way, turning the Batlló family’s drawing room into a lookout over the avenue. [2] [3] [4]
At a Glance
- AddressPasseig de Gràcia, Barcelona [1][5]
- CommissionRemodelling for Josep Batlló and his family [1][5]
- Main work1904–06 [2][3]
- Key spacesStreet gallery, principal floor, central lightwell, rear courtyard, attic and roof [4]
This work across Antoni Gaudí’s career
Casa Vicens
1883–1885: Original summer houseSagrada Família
1883–1926: Gaudí’s tenurePalau Güell
1886–1890: Main building campaignPark Güell
1900–1914: Residential estate worksCasa Batlló (current article)
1904–1906: RemodellingCasa Milà
1906–1912: Apartment houseChurch of Colònia Güell
1908–1915: From the start of building work to the opening of the lower churchContents
- From demolition application to remodelling
- A house in a row of houses
- The entrance and the principal floor
- A blue lightwell and a garden at the back
- The attic and the rooftop
- What restoration has brought to light
- Annotated details
From demolition application to remodelling
The address is number 43 on an avenue that once led from Barcelona towards the separate town of Gràcia. As the Eixample took shape under Ildefons Cerdà’s expansion plan, the route became an address for affluent families. Emili Sala Cortés designed the predecessor to Casa Batlló. A municipal permit in the name of Luis Sala dates to October 1875, and Barcelona’s archaeological annual dates the building itself to 1877. The ground held traces of an earlier use too. When archaeologists monitored work in the basement in 2016, they recorded evidence of a cistern and channels associated with the site’s earlier history, which included the Tívoli gardens. [3] [6] [5]
Josep Batlló i Casanovas, a textile industrialist, bought the property in 1903. The file in Barcelona’s municipal archive records a succession of decisions. In January 1904 Batlló applied to demolish the house, without submitting drawings. In May an application accompanied by a drawing signed by Gaudí addressed the basement and ground floor. The May drawing contains a plan and section. Its limited remit gives some measure of how far the project had expanded by autumn. On 7 November Batlló withdrew the demolition application and asked to add a basement, a fifth floor and service rooms on the roof, and to remodel the façade, ground floor and four existing upper floors. Gaudí had signed the accompanying drawings on 26 October. [3] [5] [7]
The drawings let us see what the authorities were asked to approve. The 1:100 sheet signed by Gaudí and the owner, Josep Batlló, lays out the basement, ground floor and principal floor. It distinguishes elements to be demolished from new work, so the extent of the proposed intervention can be read one floor at a time. In the municipal elevation and section the roof ends in a gable, and the turret sits nearer the centre without its cross. The familiar projecting iron balcony fronts and the glass and metal covering built over the lightwell are absent from that sheet. A separate graphite study kept by the Càtedra Gaudí explores the street front in more detail and shows a central turret with a cross. Comparing these drawings with the house reveals decisions made between application, design study and construction. [3] [7] [8] [9]
Construction proceeded before the municipal authorities settled the permission. Batlló reported on 30 April 1906 that the street façade was finished and the work enclosure had been removed. That October, Batlló and his wife asked for authorisation to let the flats and reported that the work was complete. The file stayed open for years. The documentation of additional work, payment of fees and legalisation stretches into 1912 and 1913, well beyond the main building campaign. The city granted the permit in March 1913, almost seven years after the street frontage was finished. [3] [7]
A house in a row of houses
The best place to take in the entire façade is across the avenue. The street block acquired the nickname Illa de la Discòrdia, the Block of Discord, for the cluster of houses remodelled around the same time. Next door, Josep Puig i Cadafalch gave Casa Amatller a stepped gable that climbs sharply above the street. Farther along, Lluís Domènech i Montaner remodelled Casa Lleó Morera at the corner. At the boundary with Casa Amatller, Gaudí’s turret and the brighter sweep of the roof give Casa Batlló a distinct outline. The buildings share a pavement and a party wall. Their rooflines resolve that shared setting in very different ways. [1] [2] [5]
Casa Batlló keeps much of the old rhythm of openings behind the new façade. On the upper floors, each balcony reads in silhouette as a pale curved plate with dark openings. In daylight the forms can resemble masks, each hovering against the coloured wall. Nearer the pavement, the stone has greater depth. It thickens at the feet and heads of the uprights and bends around the main-floor windows. Those windows make the principal residence legible from across the road. Each upper household has a more discrete opening and balcony. The family occupying the whole principal floor has a gallery long enough to tie together a series of rooms. [1] [2] [3]
The closer you get, the more deliberate the organisation of the colour becomes. The main field incorporates trencadís, a mosaic made with fragments, as well as whole, glazed ceramic discs of different sizes. Light catches the uneven glass surfaces at different angles. The discs give the eye fixed points in a wall whose curve and changing colours otherwise make it hard to pick out a grid. Conservation tests explain something of the effect. The builders shaped the substrate with a layer of natural cement, then pressed glass fragments into a fresh mortar bed. The pressure forced the mortar up between the pieces. Where fragments went missing, the original bed sometimes held an impression of the shape of the lost glass. [2]
The façade’s nicknames record successive ways of looking at it. The gallery’s slender uprights suggest bones, the irons suggest masks, and the ridge suggests the back of a dragon. In one much-repeated reading the turret’s cross becomes the hilt of Saint George’s weapon, with the beast beneath it. The shapes invite that reading. The account belongs to the house’s reception, and the documented revision of the roofline still leaves the architect’s intentions open. Seen from roof level, the glazed tiles reward a simpler kind of attention. Each course overlaps the one below it and adjusts to the changing curve, so the apparent scales are also the working skin of the roof. [1] [2] [10]
The entrance and the principal floor
The entrance divided the flow of people. Tenants took the communal stair, while the Batllós had a private approach. For the Batllós, a vestibule and private stair led up to the planta noble, the high first floor over the street level. The curving wooden handrail broadens and bends across the turn. The stair brings you towards lighter rooms in stages, first to Josep Batlló’s office, with the fireplace recessed beneath a low, spreading arch, then into the broad street-facing reception rooms. The fireplace has the scale of a place to sit near. A few steps farther on, the gallery opens the eye to the length of the avenue. [3] [4] [11]
The ceiling in the main room gathers into a spiral around the light fitting. Look from there towards the façade and you can see how the smooth transitions continue down into the window surrounds and joinery. Coloured glass in the upper portions admits light while interrupting a direct view. The large lower openings are there for the view itself. We tend to see photographs of the rooms standing open. The interior was also designed to change as people used it. Large timber leaves and carefully worked fittings allowed adjoining areas to be opened together or closed off. At the gallery, the study of the built house identifies counterweighted joinery that could clear the view across a broad opening. The mechanism matters as much as the curve that conceals it. [3] [4] [12]
Some of that openness depended on changes concealed behind the surfaces. The submitted plan shows substantial walls defining rooms on the principal floor. When the conservation team compared it with drawings made from the building itself, it found places where loads had been concentrated onto smaller areas of support, leaving broader intervals for the large timber openings. Metal lattice girders carried loads across parts of the ground floor where more open space was needed. Higher up, the rented apartments retained considerably more of Sala’s bearing walls. Gaudí continued working on this problem of how to free a domestic plan at Casa Milà, where a frame and a separate arrangement for supporting the stone façade gave him different options. Casa Batlló is a particularly clear example of how much can change within an existing shell. [3]
Watch films on Gaudí’s architecture
Explore the Sagrada Família, Casa Milà and Casa Batlló, then consider Gaudí’s place in European Art Nouveau.
Gaudí, Sagrada Família
Beth Harris and Steven Zucker look at the façades, branching columns and the Gothic precedents behind the basilica. The film records the building around its 2010 consecration.
Watch on YouTubeThe furnishings give these rooms a human scale that can be hard to picture in an open museum interior. Among the surviving objects at the Museu Nacional d’Art de Catalunya is a dining chair made around 1904–06 in carved ash by the Casas i Bardés workshop to Gaudí’s design. Its bare seat and shaped back are the surfaces the sitter touches. The workshop also made the two-seat Confident. Its paired backrests turn the grain of the wood into part of what you see as well as what supports the body. The museum separately catalogues a double-leaf glazed door from the house. A glazed leaf shares light between spaces even when closed, and a shaped handle gives the hand purchase on a large object. Original pieces now held in a collection have a different history from furnishings assembled for today’s visitors. Gaudí’s furniture traces the surviving objects across his commissions. [11] [13] [14] [15]

A Casa Batlló door panel brings coloured glass, round openings and continuous carved edges into the same piece of joinery. José Luiz. Image source. CC BY-SA 3.0. Resized for the web. This reproduction uses the same CC BY-SA 3.0 licence.
A blue lightwell and a garden at the back
The narrow street front gives little sense of how far the plan reaches into the block. Windows at the front and back serve the rooms at the ends of the house. In between, Gaudí enlarged the lightwell and glazed its top. A person looking up from below sees the tiled walls darken towards the sky. The deepest blue tiles are at the top, where they receive the most light. Lower down the tiles become paler, helping the dimmer levels make the most of the light that reaches them. The dimensions of the windows work in the opposite direction. Smaller openings suffice near the top, and the openings lower down are larger. Colour and window size both respond to the same change in daylight from floor to floor. [4] [11]
Look below the glass of a lightwell window and you can see adjustable timber slats. They allow air to pass while the glazed part of the window stays closed. The central well is also part of the circulation of the house. A lift with a wooden cabin occupies part of the opening, and doors, landings and windows look into it from different levels. Seen through textured glass, the straight joints between the tiles can appear to waver. The effect has helped make the well familiar from photographs. The change in tile shade, the working slats and the lift explain more about everyday life in the flats than an impression of blue light alone. [3] [4]
Cross the principal floor towards the rear and the relation to daylight changes again. The family’s private dining room opened onto a terrace inside the block. Here people could go straight out onto paving patterned in small ceramic units. Planters occupied parts of the terrace, and a pergola gave shade. Standing at the back and looking up, you can follow ceramic and glass fragments along the edges of the rear façade and over the fronts of its balconies. The curves of the ironwork carry that pattern across the openings. At this quieter elevation the material is close enough to pick out the joints, and the ironwork comes down almost to eye level at the terrace. The restored colour scheme, with green woodwork and pale iron against dark stucco, gives the fragments a very different setting from the broken field of colour at the front. [4] [16]

Looking along Casa Batlló’s tiled lightwell, the windows and blue surfaces vary from one level to the next. Tim Adams. Image source. CC BY 3.0. Resized for the web. This reproduction uses the same CC BY 3.0 licence.
Annotated Details from Casa Batlló
The numbered points identify visible features discussed in this article. Return from each detail to the numbered overview. Each caption identifies the work shown.
Windows in the tiled lightwell
Looking along Casa Batlló’s tiled lightwell, the windows and blue surfaces vary from one level to the next. Tim Adams. Image source. CC BY 3.0. Numbered overview and native-pixel detail crops from the full-resolution source image. Overview and crops use the same CC BY 3.0 licence.
Ceramic fragments and discs on the roof
With the eye close to the roof surface, individual ceramic fragments and raised discs become visible within the larger colour pattern. Steven Lek. Image source. CC BY-SA 4.0. Numbered overview and native-pixel detail crops from the full-resolution source image. Overview and crops use the same CC BY-SA 4.0 licence.
Details from CASA BATLLÓ
Compare the cropped details with the source images above. Notice how their colours, shapes and positions contribute to the larger compositions.
Windows in the tiled lightwell
Tiled wall
The diagonal joints stay legible across the surface as the colour shifts between blue and blue-grey.
Ceramic fragments and discs on the roof
The attic and the rooftop
The upper flats share a set of services above the living floors. In the attic, laundry and storage were accommodated under a succession of narrow white arches, described in the house’s account as catenary arches. In the long passage their spacing makes the structure easy to read. Each arch crosses a relatively short distance and the openings beside the passage admit light in slivers. The repeated frames mark the distance between one end of the attic and the other. This part of the house has often invited comparison with a rib cage, just as the stone at street level has invited the comparison with bones. Here you can walk through the sequence and see how a series of simple spans makes room for the work of the building. How Gaudí designed and built follows related uses of arches and masonry across his commissions. [3] [4]
On reaching the roof terrace, turn back towards the roofline you saw from the pavement. The tall tile-clad rise along the street now screens the terrace from the avenue. Its slopes stand alongside four groups of chimneys, whose curved shafts and coloured surfaces make a set of practical outlets conspicuous. The house’s account explains the shaping of the chimney groups in terms of reducing air blowing back into the building. Up close, the crowns of the chimneys carry the same kind of changes of scale that make the façade readable from several distances. Large shapes settle the outline first, then small fragments register as a surface with edges and joints. [2] [4]

With the eye close to the roof surface, individual ceramic fragments and raised discs become visible within the larger colour pattern. Steven Lek. Image source. CC BY-SA 4.0. Resized for the web. This reproduction uses the same CC BY-SA 4.0 licence.
What restoration has brought to light
The house acquired new uses room by room. By 1945 the animation company Chamartín occupied the principal floor, and some flats had become offices. The Batlló family sold the building in the 1950s, while descendants continued to occupy an upper residence. The architects and surveyors commissioned by the Friends of Gaudí in the 1950s, under Lluís Bonet i Garí, recorded a building that had already begun to change. Their drawings are useful precisely because they show what actually stood. They can be compared with the planning sheets and with photographs from 1927 in the Mas Archive. The photographs answer questions a measured plan cannot, such as how an opening was fitted out or what a room looked like while furnished. The 2014 survey gave the researchers a third set of plans to compare with the 1904 drawings and Bonet’s measurements. On the principal floor, later office conversion records help account for changes between the surveys. Casa Batlló joined UNESCO’s collective listing of Gaudí’s works in 2005. [3] [5] [17] [18]
On the principal floor, small inspections through layers of later paint found patches of surviving stucco. As the conservators enlarged their test areas, they discovered graphite numbers and the drawn line of the top of the timber panelling. These were useful because the panelling curved with the walls. A surviving number or line helped establish which particular piece belonged where. In Batlló’s office they found gold leaf on the dividing lines of the patterned stucco and uncovered it with scalpels. Survival varied across the floor. Some rooms kept their original layout and finishes. In others, later partitions and services had interrupted the design, and the restored appearance includes repairs or new work informed by what the team could establish. [12]
The familiar street façade presented different problems. Before the 2019 restoration, the specialists mapped the surface and tested how the grey Montjuïc sandstone responded to cleaning. A stone upright, a glazed disc and a section of iron railing age in different ways. Removing a dark deposit indiscriminately could take with it part of the original stone surface. Close examination of the mortar beds also helped the team fit replacements where pieces of glass were missing. The resulting façade preserves original work alongside local repairs. Photography and three-dimensional survey record the condition before and after intervention, which makes a replacement easier to identify when the materials themselves look convincingly alike. [2] [19]
A later campaign, begun in 2024 and presented in 2025, worked on the terrace and rear façade. Historic photographs and samples taken through successive coats of paint changed the team’s understanding of the elevation. The stucco, long seen in a lighter colour, was shown to have been dark. The ironwork had originally been pale, and the woodwork green. Much of the glass and ceramic work could be treated in place. Below the balconies, the team restored the reinforced brick and iron supports. The ironworkers removed welds from a previous repair and used the original assembly with nuts and bolts. Old photographs helped reconstruct the lost pergola, the planters and the pattern of the small Nolla mosaic tiles. The garden has regained its shade and the original pattern underfoot through identifiable new work. A further restoration, presented in May 2026, exposed historic joinery and finishes in a third-floor residence long occupied by descendants of the family. Mercedes Batlló Godó and her husband had moved into the residence in 1917. Its enlargement to take in three quarters of the floor was already an adaptation of the letting plan. Today the restored rooms contain contemporary as well as period furniture, another change in how the building is used. [16] [20] [18]
Across the road again, try finding the private rooms from their position in the street elevation. The long first-floor gallery belongs to the rooms at the top of the family stair. Each narrow balcony above marks a room in a household that shared the glazed well and the service attic with its neighbours. Even the raised sweep of scales at the top of the frontage tells you something about use. It keeps the eye on the roofline while the chimneys do their work behind it. [1] [3] [4] These were recurring domestic concerns in Gaudí’s architecture, and a point of departure for his interior designs.
Browse the buildings and designs
Explore Gaudí’s buildings, landscapes and designed objects, alongside lost works and projects known through documents. The entries identify collaborative and attributed work where relevant.
| Name | Date | Place, use and survival |
|---|---|---|
| Casa Vicens | 1883–85, original house | Summer house with a later enlargement. |
| Güell Pavilions and Estate | 1880s | Estate entrance and service buildings. The site and gardens changed in later campaigns. |
| Palau Güell | 1886–90, main campaign | Restored urban mansion in the Raval. |
| Teresian College | Late 1880s | College and convent adapted from an earlier project. The existing annex chapel is by Gabriel Borrell i Cardona. |
| Casa Calvet | Late 1890s | Textile premises and dwellings. |
| Torre Bellesguard | Early 1900s | House and site works beside traces of an earlier royal residence. |
| Park Güell | c. 1900–14, estate works | Partly realised residential estate, later a public park. |
| Gaudí House Museum | Early 1900s; Gaudí lived here 1906–25 | Estate show house designed by Francesc Berenguer, later Gaudí’s residence. |
| Portal Miralles | Early 1900s | Surviving estate gateway and a length of enclosing wall. |
| Casa Batlló | 1904–06, remodelling | Remodel of an existing residential building. |
| Casa Milà | 1906–12 | Apartment block, later restored. |
| Sagrada Família | Begun 1882; Gaudí from 1883 | Basilica built in successive campaigns under Gaudí and other architects. |
| Sagrada Família Schools | Early 1900s, original school | School subsequently rebuilt and relocated on the site. |
| Plaça Reial Lampposts | 1878 commission; installed 1879 | Municipal street furniture. |
| Sant Pacià Mosaic Pavement | Late 1870s | Tessellated church pavement. |
| Nau Gaudí and the Mataró Workers’ Cooperative | 1883, bleach hall | Mataró. Restored bleach hall and a separate surviving latrine building within a larger scheme. |
| Bodegas Güell | 1890s | Garraf. Winery and service buildings, with drawings credited by the architects’ archive to Gaudí and Francesc Berenguer. |
| Church of Colònia Güell | Begun 1908; lower church opened 1915 | Santa Coloma de Cervelló. Lower church of a partly realised design. |
| Jardins Artigas | Early 1900s | La Pobla de Lillet. Restored riverside garden. |
| Xalet del Catllaràs | Early 1900s | La Pobla de Lillet. Lodge associated with the mines. Research published by the Consell distinguishes Gaudí’s design from decisions made in execution. |
| First Mystery of Glory at Montserrat | Early 1900s, first campaign | Montserrat. Monument to the Resurrection in a larger devotional ensemble, executed in phases. |
| El Capricho de Gaudí | 1880s | Comillas. Summer villa, subsequently restored. |
| Puerta de los Pájaros | Early 1900s, attributed | Comillas. Casa del Moro boundary gate, locally attributed to Gaudí. |
| Casa Botines | 1891 drawings; building work in 1892 | León. Commercial and residential building, later converted to new uses. |
| Episcopal Palace of Astorga | 1889–93 under Gaudí; finished 1913 | Astorga. Palace begun under Gaudí and finished by Ricardo García-Guereta. |
| Gaudí’s Restoration of Mallorca Cathedral | Early 1900s | Palma. Liturgical intervention in an existing cathedral. |
| Bar Torino | 1902, Passeig de Gràcia interior | Barcelona, Passeig de Gràcia. Lost collaborative bar interior. |
| Compañía Trasatlántica Pavilion | 1888, Barcelona exposition | Barcelona, 1888 Universal Exposition. Lost exhibition building. |
| Banner of Misericòrdia | 1900 | Reus. Lost pilgrimage banner designed by Gaudí with a painting by Aleix Clapés. |
| Franciscan Missions in Tangier | Early 1890s | Tangier. Documented unbuilt mission complex. |
| Hotel Attraction and Its Attribution | Posthumous drawings of the 1950s | New York. Unbuilt hotel associated with Gaudí through posthumous drawings. The commission is uncertain. |
| Capilla de Nuestra Señora de los Ángeles | 1922 correspondence; later proposal | Rancagua. The historic proposal was unbuilt. A later Chilean project drew on Gaudí’s Barcelona chapel design. |
Frequently Asked Questions
Discussion
Look again at the images and ideas explored in Casa Batlló. These editorial prompts invite your observations.
Reader Insights
How does your reading of the street façade change after considering which parts of the old building survived?
Where do colour and material do the most practical work in the house?
What clues in the central lightwell tell you that conditions at the top differ from those below?
Join the Conversation
Share a detail, comparison or question about Casa Batlló below.
References
- Consell Gaudí, Casa Batlló, Catalan account of the house, neighbourhood and reception. View source.
- Xavier Villanueva, Joan Olona, Manuel Ángel Iglesias-Campos, Mireia Bosch, Joan Ramon Rosell, Antonia Navarro and Ignasi Villanueva, “Restauración de la fachada de Casa Batlló de Gaudí,” Loggia, no. 33, 2020, pp. 118–139, DOI 10.4995/loggia.2020.14066. View source.
- Mireia Bosch, Joan Olona, Amílcar Vargas, Xavier Villanueva, Ignasi Villanueva and Ana Atance, “Plan Director de la Casa Batlló de Gaudí. Gestión y documentación,” Loggia, no. 33, 2020, pp. 76–97, figs. 5–10 and 14–21, DOI 10.4995/loggia.2020.14042. View source.
- Casa Batlló, “The Interior,” description of the principal floor, lightwell, courtyard, attic and rooftop. View source.
- Casa Batlló, “The History,” Eixample setting, acquisition and later ownership. View source.
- Servei d’Arqueologia de Barcelona, “Casa Batlló,” Anuari d’arqueologia i patrimoni de Barcelona 2016, intervention 083/16, p. 58. View source.
- Mario Andruet, Fundación Antonio Gaudí, Los planos de Gaudí del Park Güell y la Casa Batlló, pp. 4–9, with reproductions from Barcelona’s municipal file 9612 of 1904. View source.
- Universitat Politècnica de Catalunya, Càtedra Gaudí, photographic catalogue record FF_012704 of the signed Casa Batlló basement, ground-floor and principal-floor plan, 1904. View source.
- Universitat Politècnica de Catalunya, Càtedra Gaudí, Casa Batlló: façana, CG-000220, a separate façade and section study catalogued to 1904. View source.
- Casa Batlló, “The Façade,” description and popular readings of the street elevation. View source.
- Museu Nacional d’Art de Catalunya, “Casa Batlló,” Els interiors modernistes a Barcelona. View source.
- Joan Olona, Mireia Bosch, Xavier Villanueva and Ignasi Villanueva, “Criterios de intervención en la restauración de la planta noble de la Casa Batlló de Antoni Gaudí,” Loggia, no. 33, 2020, pp. 98–115, DOI 10.4995/loggia.2020.14039. View source.
- Museu Nacional d’Art de Catalunya, Cadira del menjador de la Casa Batlló, Gaudí and Taller Casas i Bardés, c. 1904–06, inv. 250413-000. View source.
- Museu Nacional d’Art de Catalunya, Confident, Gaudí and Taller Casas i Bardés, c. 1904–06, inv. 156070-000. View source.
- Museu Nacional d’Art de Catalunya, Porta vidriera flotant de doble batent, 1904–06, inv. 156094-CJT. View source.
- Casa Batlló, Gaudí’s Hidden Garden: Record of a Historic Restoration, 2025, pp. 4–49. View source.
- UNESCO World Heritage Centre, Works of Antoni Gaudí, listing no. 320bis, Casa Batlló component 320-006. View source.
- Belén Onecha Pérez, Mireia Bosch Prat, Joan Olona Casas and Alicia Dotor Navarro, “Plan Director de restauración de la Casa Batlló de Gaudí, un antes y un después,” ACE: Architecture, City and Environment, 11, no. 33, 2017, pp. 65–86, figs. 4–9, DOI 10.5821/ace.11.33.4732. View source.
- Casa Batlló, “All about the restoration of the façade,” 19 March 2019. View source.
- Casa Batlló, “The History,” account of occupation and restoration of the third-floor residence. View source.


