Sagrada Família Schools Antoni Gaudi Buy Art Prints Now
from Amazon

* As an Amazon Associate I earn from qualifying purchases.


by
Tom Gurney BSc (Hons) is an art history expert with over 20 years experience
Published on June 19, 2020 / Updated on November 22, 2026
Email: tomgurney1@gmail.com / Phone: +44 7429 011000

Sagrada Família Schools: Introduction

At the foot of the Sagrada Família in Barcelona, a low brick building has a roof that rises and dips across the length of its walls. Antoni Gaudí designed the Provisional Schools in 1909 for the children of people working on the church and for other children in the neighbourhood. Gaudí fitted three classrooms beneath a single roof, using ordinary bricks and straight timbers to make its walls and roof curve. [1] [2]

At a Glance

  • ArchitectAntoni Gaudí i Cornet. [1]
  • Date1909. [1]
  • Original useProvisional parish school for construction workers’ children and other local pupils. [1]
  • ConstructionThin, undulating brick walls and a curved tile roof carried on timber planks and a central metal beam. [2]
  • RelocationPartly dismantled and rebuilt in 2002 beside the Passion façade, with its front turned towards Carrer de Sardenya. [1] [2]

This work across Antoni Gaudí’s career

Project dates
18751888190119141926

Sagrada Família Schools (current article)

Early 1900s, original school

Casa Vicens

1883–1885: Original summer house

Sagrada Família

1883–1926: Gaudí’s tenure

Palau Güell

1886–1890: Main building campaign

Park Güell

1900–1914: Residential estate works

Casa Batlló

1904–1906: Remodelling

Casa Milà

1906–1912: Apartment house

Church of Colònia Güell

1908–1915: From the start of building work to the opening of the lower church

Contents

  1. A school on the building site
  2. What the curves do
  3. Fire and rebuilding
  4. What was moved in 2002
  5. Annotated details

A school on the building site

The Schools stood within the plot of the Sagrada Família, near the corner of Carrer de Mallorca and Carrer de Sardenya, on land the church would eventually need as its nave extended towards the Glory façade. For the time being, it could supply a classroom within reach of the streets where the pupils lived. The church was still rising when lessons began. The school and the construction site thus served some of the same families at the same time, one as a place of work and the other as a place to learn. [1] [2] [3]

Gil Parés i Vilasau, the priest who promoted the school and became its first director, brought the proposal to Gaudí. The Junta Constructora, the body responsible for building the temple, describes the school as coeducational and places it within the church’s local charitable work. In a biography published by the association promoting Gaudí’s canonisation, Armand Puig and Francesc Torralba credit the architect with paying for the building himself. [3] [4] [5]

The plan is broadly rectangular. A projecting entrance marks the centre of the front, the classrooms occupy the long body of the building and the patios lie behind. Openings from the classrooms towards the yard made the outside space useful for lessons. A photograph published in 1910 shows boys and girls arranged in rows there, their arms extended as a teacher directs a gymnastics exercise. The historian Xavier Torrebadella Flix connects the school’s use of the outdoors with the teaching practices of the priest Andrés Manjón, an influence on Parés. The yard gave a class room to spread out, with the doorways providing a direct route back indoors. [2] [3]

Two groups of schoolchildren look towards the middle of an open space near a thatched shelter.
The 1910 Ilustració Catalana report shows a geometry class outside the Sagrada Família Schools. Ilustració Catalana, no. 376, 21 August 1910. Image source. Public domain. Resized for the web.

What the curves do

Follow a long wall from one end to the other and it swings gently in and out, bending more sharply where it turns the corner. In the original building, two leaves of thin brick with mortar between them gave a combined thickness of about nine centimetres, according to the architects Josep Maria Adell and Alfonso García Santos. The bricks were set upright to show their broad faces. The relatively short step from one upright joint to the next allowed the courses to turn in small increments. Seen along the wall, the result is a continuous sweep made from ordinary rectangular pieces. [2]

The bends help the brickwork resist movement sideways. A similar strip of masonry laid flat in plan would have less stiffness across its thickness. Here the wall can remain slender because its line keeps changing direction. Santiago Huerta, writing about Gaudí’s structural designs, describes his broader interest in finding forms that suit the way a building carries forces, and relates his use of ruled surfaces to the ease with which they could be set out for construction. At the Schools, the curved enclosure saved brick while the geometry of the roof let Gaudí use straight timbers. [1] [2] [6]

Look up from inside and the roof becomes easier to understand. Along the middle of the building ran a straight metal beam resting on three supports. Straight timber planks spanned from it to the walls on either side. As the wall top rose and fell, successive planks met it at different heights and angles. The layer of ceramic tiles laid over them followed that change of pitch. This is the principle of the conoid, a surface in which straight lines join a straight guide to a curved one. The roof’s waves could therefore be built with repeated straight pieces of timber, each set to suit its place. [2]

In early views, a low ridge runs above the central beam. Adell and García Santos identify it in photographs taken before the fire and in sketches by Le Corbusier and Luis Moya Blanco. Le Corbusier, who visited in 1928, marked the beam in his notebook. The ridge divided the roof into two slopes and helped direct water towards the outer walls. Adell and García Santos leave open whether it was installed in 1909 or added when the centre of the roof proved liable to collect water. [1] [2]

Watch films on Gaudí’s architecture

Explore the Sagrada Família, Casa Milà and Casa Batlló, then consider Gaudí’s place in European Art Nouveau.

Fire and rebuilding

In July 1936, at the outbreak of the Spanish Civil War, fire destroyed the timber supporting the tile roof and most of the roof fell. A photograph of the burned school reproduced by Adell and García Santos shows perimeter walls still standing and the exposed metal beam bent by the heat. The same assembly that had allowed a light roof to span the rooms helps explain what was lost. When the timber beneath it burned, the tile covering lost its support, while much of the upright brickwork survived. [2] [3]

The COAC’s building record dates a wartime rebuilding to 1938. Torrebadella Flix attributes that first rebuilding to the Council for the Unified New School, while Adell and García Santos credit Quintana with both rebuilds. The sources also differ on the second fire. Torrebadella Flix dates it to 1938, while the English summary of Adell and García Santos’s study gives 1939. Their article identifies the postwar roof as the work of Francesc de Paula Quintana in 1940. His rebuilding plan, reproduced in the study, shows where walls were remade and where the rooms were reinforced. The roof omitted the earlier ridge and continued across the centre, with successive waves draining towards opposite sides. The resulting silhouette still recalled Gaudí’s, but a roof seen between 1940 and the relocation already embodied decisions made after his death. [1] [2] [3]

What was moved in 2002

As the church expanded towards the Glory façade, one of its supports took up part of the school’s former footprint. Adell and García Santos date the cutting away of the school’s corner to 1995 in their illustrated account. In 2001, the architects began preparing a practice reconstruction at Montigalà in Badalona. There, bricklayers from the temple and apprentices could try out how to set out the curves before rebuilding beside the church. The Badalona school is a separate replica made with new bricks. In Barcelona, the Junta chose to rebuild around the surviving sections. Adell had instead proposed moving the school as a single unit to preserve the remaining walls and keep their relationships to one another. His proposal would have taken the building out of the temple enclosure, across the street to the neighbouring square. [2] [7]

The Junta’s project for the Barcelona site was drawn up by Jordi Bonet, Jordi Faulí and Mariona Bonet. Excavation for the new foundations began in late January 2002. The school stayed in the southern corner of the overall plot, but its front turned through a quarter turn to face Carrer de Sardenya, with the rear towards the cloister on the Passion side. A crane lifted the central entrance and two small side projections across the site. Mariona Bonet’s account from that year records how the team also lifted the brickwork over most of the openings and fitted it into the rebuilt walls. Inside, the builders reused the original foundation blocks for the roof supports and reproduced the riveted connections of the metal frame. [2] [7]

The distinction between old brick and original wall matters here. Bonet notes that some of the bricks used to rebuild the enclosure came from the old boundary wall of the temple plot. They were reused in 2002 even though the bricks themselves were much older. The deeper red of the retained wall sections helps show where they meet the rebuilt stretches. The roof, which the team began to rebuild in June, incorporated timber planks and ceramic layers once again. Bonet describes the use of a surviving part of the central waterspout and provision for insulation. Adell and García Santos argue that the roof still follows Quintana’s ridge-free profile and that some of the new wall curves differ from the early ones. [1] [2] [7]

The easiest place to start reading the relocated school is at an entrance. Follow the brickwork out from the retained section to the adjoining wall, then follow the edge of the roof to a waterspout. Those short distances take in several periods of work. [2] [7]

Barcelona’s planning documents include the Schools in the protected temple complex under catalogue entry 1549, while the COAC’s individual record lists the school as a Cultural Asset of Local Interest. The UNESCO inscription for the Works of Antoni Gaudí names the Nativity façade and crypt as its Sagrada Família component. [1] [8] [9]

A small brick school with an undulating roof stands next to the much larger stone basilica.
The relocated school’s low roof and brickwork stand out against the tall basilica construction behind it. Yair Haklai. Image source. CC BY-SA 3.0. Resized for the web. This reproduction uses the same CC BY-SA 3.0 licence.

Historic photograph of the low brick school with the word Escoles above its entrance and a roof whose edge rises and falls.
The newly built Sagrada Família Schools pictured in the 21 August 1910 issue of Ilustració Catalana. Ilustració Catalana, no. 376, 21 August 1910. Image source. Public domain. Resized for the web.

Annotated Details from Sagrada Família Schools

The numbered points identify visible features discussed in this article. Return from each detail to the numbered overview. The relocated school’s low roof and brickwork stand out against the tall basilica construction behind it. Yair Haklai. Image source. CC BY-SA 3.0. Numbered overview and native-pixel detail crops from the full-resolution source image. Overview and crops use the same CC BY-SA 3.0 licence.

Annotated details from Sagrada Família Schools by Antoni Gaudí

Details from SAGRADA FAMÍLIA SCHOOLS

Compare the cropped details with the source images above. Notice how their colours, shapes and positions contribute to the larger compositions.

1

Roof edge

The low brick school has a roofline that rises and falls above the openings.

Roof edge detail from Sagrada Família Schools by Antoni Gaudí

Return to the numbered overview

2

Scale of the new setting

The tall walls and larger openings beside the school show the difference in scale at the present site.

Scale of the new setting detail from Sagrada Família Schools by Antoni Gaudí

Return to the numbered overview

Browse the buildings and designs

Explore Gaudí’s buildings, landscapes and designed objects, alongside lost works and projects known through documents. The entries identify collaborative and attributed work where relevant.

32 records

NameDatePlace, use and survival
Casa Vicens1883–85, original houseSummer house with a later enlargement.
Güell Pavilions and Estate1880sEstate entrance and service buildings. The site and gardens changed in later campaigns.
Palau Güell1886–90, main campaignRestored urban mansion in the Raval.
Teresian CollegeLate 1880sCollege and convent adapted from an earlier project. The existing annex chapel is by Gabriel Borrell i Cardona.
Casa CalvetLate 1890sTextile premises and dwellings.
Torre BellesguardEarly 1900sHouse and site works beside traces of an earlier royal residence.
Park Güellc. 1900–14, estate worksPartly realised residential estate, later a public park.
Gaudí House MuseumEarly 1900s; Gaudí lived here 1906–25Estate show house designed by Francesc Berenguer, later Gaudí’s residence.
Portal MirallesEarly 1900sSurviving estate gateway and a length of enclosing wall.
Casa Batlló1904–06, remodellingRemodel of an existing residential building.
Casa Milà1906–12Apartment block, later restored.
Sagrada FamíliaBegun 1882; Gaudí from 1883Basilica built in successive campaigns under Gaudí and other architects.
Sagrada Família SchoolsEarly 1900s, original schoolSchool subsequently rebuilt and relocated on the site.
Plaça Reial Lampposts1878 commission; installed 1879Municipal street furniture.
Sant Pacià Mosaic PavementLate 1870sTessellated church pavement.
Nau Gaudí and the Mataró Workers’ Cooperative1883, bleach hallMataró. Restored bleach hall and a separate surviving latrine building within a larger scheme.
Bodegas Güell1890sGarraf. Winery and service buildings, with drawings credited by the architects’ archive to Gaudí and Francesc Berenguer.
Church of Colònia GüellBegun 1908; lower church opened 1915Santa Coloma de Cervelló. Lower church of a partly realised design.
Jardins ArtigasEarly 1900sLa Pobla de Lillet. Restored riverside garden.
Xalet del CatllaràsEarly 1900sLa Pobla de Lillet. Lodge associated with the mines. Research published by the Consell distinguishes Gaudí’s design from decisions made in execution.
First Mystery of Glory at MontserratEarly 1900s, first campaignMontserrat. Monument to the Resurrection in a larger devotional ensemble, executed in phases.
El Capricho de Gaudí1880sComillas. Summer villa, subsequently restored.
Puerta de los PájarosEarly 1900s, attributedComillas. Casa del Moro boundary gate, locally attributed to Gaudí.
Casa Botines1891 drawings; building work in 1892León. Commercial and residential building, later converted to new uses.
Episcopal Palace of Astorga1889–93 under Gaudí; finished 1913Astorga. Palace begun under Gaudí and finished by Ricardo García-Guereta.
Gaudí’s Restoration of Mallorca CathedralEarly 1900sPalma. Liturgical intervention in an existing cathedral.
Bar Torino1902, Passeig de Gràcia interiorBarcelona, Passeig de Gràcia. Lost collaborative bar interior.
Compañía Trasatlántica Pavilion1888, Barcelona expositionBarcelona, 1888 Universal Exposition. Lost exhibition building.
Banner of Misericòrdia1900Reus. Lost pilgrimage banner designed by Gaudí with a painting by Aleix Clapés.
Franciscan Missions in TangierEarly 1890sTangier. Documented unbuilt mission complex.
Hotel Attraction and Its AttributionPosthumous drawings of the 1950sNew York. Unbuilt hotel associated with Gaudí through posthumous drawings. The commission is uncertain.
Capilla de Nuestra Señora de los Ángeles1922 correspondence; later proposalRancagua. The historic proposal was unbuilt. A later Chilean project drew on Gaudí’s Barcelona chapel design.

Frequently Asked Questions

Who went to the Sagrada Família Schools?

The parish school served children of the temple’s construction workers as well as other children from the surrounding neighbourhood. The Junta’s account describes it as coeducational, and a photograph published in 1910 shows boys and girls exercising together in the yard. [1] [3] [4]

Why does the school have a wavy roof?

A straight central beam and the changing height of the wall tops gave the straight roof planks different angles along the building. The tile surface followed the planks in a series of waves. In early views, a ridge along the centre divided the two slopes for drainage. [2]

How much of Gaudí’s school survives?

The 2002 reconstruction incorporates the central entrance, two side projections and other salvaged details, including brickwork from above openings. Adell and García Santos estimate that about 45 percent of Gaudí’s original walls remained in the relocated building. Their estimate concerns the walls. The roof is a reconstruction with a separate history of wartime loss and postwar changes. [2] [7]

Discussion

Look again at the images and ideas explored in Sagrada Família Schools. These editorial prompts invite your observations.

Reader Insights

Editorial prompt · Follow a line through the roof

How can a row of straight boards make the surface above them look as if it rolls from one side of the building to the other?

Editorial prompt · Read the building through its joins

What can a change of colour where two sections of wall meet tell you about the 2002 move? What other evidence would help you date the bricks on either side?

Editorial prompt · A place for lessons

What do the scale and materials of the school tell you about the day-to-day work it was built to accommodate?

Join the Conversation

Share a detail, comparison or question about Sagrada Família Schools below.

References

  1. Col·legi d’Arquitectes de Catalunya, Escoles Provisionals de la Sagrada Família View source.
  2. Josep Maria Adell and Alfonso García Santos, Gaudí y las bóvedas de las escuelas de la Sagrada Familia, Informes de la Construcción 56 (496), 2005, pp. 31–45 View source.
  3. Xavier Torrebadella Flix, La escolarización de la educación física: un análisis de cinco imágenes publicadas en la prensa de Barcelona de principios del siglo XX (1910–1913), Revista Brasileira de História da Educação 20, 2020 View source.
  4. Junta Constructora de la Sagrada Família, Social Action Fund View source.
  5. Armand Puig i Tàrrech and Francesc Torralba Roselló, Antoni Gaudí (1852–1926). El arquitecto de Dios, Asociación Canónica Antoni Gaudí, 2024, p. 10 View source.
  6. Santiago Huerta, Structural Design in the Work of Gaudí, Architectural Science Review 49 (4), 2006, pp. 324–339 View source.
  7. Mariona Bonet i Agustí, L’obra de trasllat i reconstrucció de les Escoles de la Sagrada Família, Temple, September–October 2002, reproduced in the COAC’s XXVII Curset dossier View source.
  8. Barcelona City Council, Modificació del Pla General Metropolità per a l’ajust de qualificacions en el tram del carrer Provença, §4.3 View source.
  9. UNESCO World Heritage Centre, Works of Antoni Gaudí View source.